Sheet standards
Title blocks, view templates, naming and the drawing register set up before any sheet is produced.
Drawings are a view of the coordinated model, not a parallel deliverable — which is the only way a change stays one event instead of two.
BIM documentation & drawings
Where drawings are drafted alongside the model, a change is two events and they eventually disagree. Where drawings are derived from model state, a change is one event. Getting to the second condition requires template, view and sheet discipline set up before authoring starts, which is why we do that first and will not skip it to save a week.
Penetrations, openings and cast-in items are the deliverable with the hardest deadline on the project and the one most often produced last. We take the coordinated model, extract every penetration, and issue it as a drawing and a schedule the structural engineer can review — before the pour, not as an RFI afterwards.
Installation drawings need real fittings, real support positions and real clearances. A design-stage model does not hold those by default, so the level of development for shop drawings is agreed explicitly — it is the largest single driver of drawing cost.
Deliverables
Any of these can be appointed on their own or combined. Nothing here depends on buying the intelligence layer, which is not for sale in any case.
Catalogue scope
The full list from the BIMRACE service catalogue. Each item can be included or excluded in a proposal; the code is the one used in our scope documents.
How it runs
Sequence is not a formality on this kind of work. Most of the expensive rework we are asked to fix was produced by doing step four before step two.
Title blocks, view templates, naming and the drawing register set up before any sheet is produced.
Agree what has to be modelled to installation standard and what does not — the scope conversation, made explicit.
Drawings produced only from the coordinated model, so they reflect the resolved position of services.
Penetrations and openings extracted, dimensioned and scheduled for structural review.
Plans, sections, risers, details and shop drawing sheets derived from model state.
Issued under revision control with the drawing register updated.
What we need to start
Missing any of these is survivable. Not knowing which of them are missing is not, so we establish it at enquiry stage rather than at forty per cent.
AI & automation
AI is used throughout our delivery workflow, and an engineer reviews every output. Every line carries its real status.
Scope boundary
Published because a scope boundary discovered at month three is a dispute, and the same boundary stated at enquiry stage is just information.
Request a quote
Tell us the building, the stage and what you need. An engineer replies within two working days with approach, deliverables and a fee basis.
Quote request received
Have drawings ready? Use the full enquiry form to attach them.
What a useful quote needs. Building type and approximate area, the disciplines, the project stage, and which drawings or models exist. If you have them ready, the full enquiry form takes file uploads.
NDAs. We sign before drawings or models are shared, as a matter of course.
FAQ
From the model. Plans, sections and details are generated from the coordinated Revit model so drawings reflect the coordinated position of services.
Yes. We set up sheets, view templates and naming to your standards or the project's BIM requirements.
Yes. Penetration extraction from the coordinated model is automated, and the output is a dimensioned drawing plus a schedule the structural engineer can review.
Yes, where contracted. The export settings and layer or IFC mapping are agreed at the start.